Service · Sidewalk sheds & scaffolding

Sidewalk sheds and scaffolding. Permitted, maintained, and taken down on time.

DOB-permitted sheds, supported scaffold and suspended rigging — installed and maintained by the same team doing the work above them, so the shed comes down when the job ends, not years later.

ServicesLocal Law 11 / FISPLandmark restorationWaterproofing & roofingSidewalk sheds & scaffoldingBalconies & parapetsEmergency stabilization

Why the shed should belong to the contractor doing the work

New York has more than 8,000 sheds up at any time, and the ones that stay for years are almost always the ones nobody owns: the shed company put it up, the repair contractor never finished, and the building keeps paying rent on scaffolding. When Titan is the facade contractor, the shed and the rigging are part of our scope. We permit it, maintain it, light it, and remove it the week the engineer signs off.

What we provide

  • Sidewalk sheds — heavy-duty sheds designed and permitted for the building and the work above, with DOB-required lighting, signage and inspections.
  • Supported (pipe) scaffold — for low-rise and mid-rise elevations, courtyards and setbacks.
  • Suspended scaffold and rigging — motorized platforms, outrigger beams and parapet clamps for high-rise work, operated by licensed riggers.
  • Overhead protection and netting — debris netting, roof protection and pedestrian protection at entrances.
  • Emergency sheds — fast installation when an Unsafe condition or a DOB order requires immediate public protection. See emergency stabilization.

Permits and the clock

The DOB has tightened the rules on how long a shed may stand and what it must look like. Permits are time-limited and renewals must show the work is progressing. Because we hold both the shed permit and the facade work, there is one schedule and one party accountable for keeping the shed legal and getting it down.

Rig once

Most buildings pay for rigging more than once because the trades were scoped separately. We sequence LL11 repairs, waterproofing, lintels, balconies and roof work so the building is accessed one time. That is often the single largest saving on a facade program.

Owners' questions

How long will the shed be up?

As long as the work above it takes, and not longer. On a typical LL11 repair that is three to nine months. We give you the schedule at contract and report against it every week.

Who pays for the shed if the job runs long?

If it runs long for reasons within our control, we do. That is the point of having the shed and the facade work under one contract.

Can retail stay open under the shed?

Yes. We design around entrances, signage and display windows, and we have kept Madison Avenue and Broadway retail open under our sheds throughout the work.

Do you install sheds for other contractors?

Our focus is sheds and rigging for the facade work we perform. For a standalone shed we will refer you to a specialist.