Service · Local Law 11 / FISP

Local Law 11 (FISP) repairs, from SWARMP or Unsafe back to Safe.

Cycle 10 is open. We coordinate with your QEWI, scope the repairs by elevation, do the work, document every drop, and support the filing that closes the cycle.

ServicesLocal Law 11 / FISPLandmark restorationWaterproofing & roofingSidewalk sheds & scaffoldingBalconies & parapetsEmergency stabilization

What a Local Law 11 contractor actually does

Your Qualified Exterior Wall Inspector (QEWI) finds the conditions and files the report. Someone still has to fix them, on a schedule the DOB enforces. That is the job Titan does: we price the conditions in your FISP report by elevation and quantity, protect the public with a DOB-permitted shed where required, carry out the masonry, waterproofing and structural repairs, and give your engineer the documentation to re-file the building as Safe.

We have been doing this since 2004 across more than 560 jobsites in the five boroughs — co-ops, condos, rentals, institutional buildings and landmarks.

The three situations we see most

  • SWARMP with a deadline coming. Your last report listed "Safe With A Repair and Maintenance Program" conditions. They must be corrected before your next filing, and the same condition cannot be filed SWARMP twice. The cheapest time to fix them is early in the cycle, when you can plan the rigging once.
  • Unsafe. A shed is up (or must go up), monthly penalties are accruing, and the board needs a contractor who can mobilize, repair and support the engineer's re-filing quickly. See also our emergency stabilization page.
  • No filing on record. Either the building is exempt, the address is written differently in DOB records, or a filing was missed. We check it for free and tell you plainly which one it is.

How we run an LL11 repair

1

Free building check

We pull your current FISP status, cycle window and penalties on record, and walk you through them in plain English.

2

Scope by elevation

Every condition in the report becomes a line item with a quantity, so you can compare bids honestly and your engineer can verify the work.

3

Protect and rig once

DOB-permitted sidewalk shed, supported or suspended scaffold. We sequence the work so the building is rigged one time, not once per trade.

4

Repair and document

Masonry, lintels, parapets, balconies, sealants, waterproofing. Daily photo reports from every drop go to the board and the engineer.

5

Close the cycle

Engineer sign-off and the documentation for the amended filing. Then the building is Safe for another five years.

What drives the price

Three things: how much rigging the building needs (a shed and suspended scaffold can be a third of a facade job), how many elevations and how high, and what the conditions actually are once we are on the wall (open joints and spalled brick are cheap; failed lintels, parapets and terra cotta are not). We price from your FISP report and a walk-through, and we tell you what we think the report missed before you sign, not after.

Owners' questions

How often does my building need a FISP inspection?

Every five years, if the building is taller than six stories. The current cycle is Cycle 10 (2025–2030); your exact filing window depends on the last digit of your block number. We check it for you for free.

Do you replace our engineer?

No. The QEWI is independent by design. We work with the engineer you have and coordinate the inspection, scope and sign-off with them. If you do not have one yet, we can recommend engineers we have closed many cycles with.

What happens if we do nothing?

Failure to file carries a $5,000 per year civil penalty, late filing $1,000 per month, and unresolved Unsafe conditions $1,000 per month plus the cost of the shed while it stands. A facade incident with no valid filing is a liability problem no premium wants to cover.

Can the repairs be phased?

Often yes, by elevation or by condition, as long as Unsafe items are addressed first and the engineer agrees. We will tell you where phasing saves money and where it just means paying for rigging twice.

Related work

See all projects →

Is your building next?

Local Law 11 deadline coming up, or a facade condition you're worried about? We'll check your building's FISP status — free.

Check my building